ßäåðíà ô³çèêà òà åíåðãåòèêà
ISSN:
1818-331X (Print), 2074-0565 (Online) |
Home page | About |
Principal provisions of the decommissioning concept for the WWR-M research reactor
Yu. M. Lobach*, E. D. Luferenko, M. V. Lysenko, V. M. Shevel
Institute for Nuclear Research, National Academy of Sciences of Ukraine, Kyiv, Ukraine
*Corresponding author. E-mail address:
lobach@kinr.kiev.ua
Abstract: The decommissioning Concept for WWR-M research reactor is developed to meet the requirements of the current Ukrainian legislation. The main goal of the Concept is to provide a strategic stage of the work planning, including all the required justifications with a sufficient level of detail. It will allow during the next planning stage to develop the decommissioning project and other documents required to obtain the decommissioning license. The Concept is the institutional and technical document, which defines and substantiates the basic administrative, organizational, and technical measures for the preparation and implementation of the reactor decommissioning. It also describes the main activities and works, defines the procedure, conditions for their implementation and provision, and planned deadlines.
Keywords: research reactor, decommissioning, dismantling, radioactive waste.
References:1. Policies and strategies for the decommissioning of nuclear and radiological facilities. IAEA Nuclear Energy Series No. NW-G-2.1 (Vienna, IAEA, 2011) 43 p. https://www-pub.iaea.org/MTCD/Publications/PDF/Pub1525_web.pdf
2. Decommissioning of small medical, industrial and research facilities: a simplified stepwise approach. IAEA Nuclear Energy Series No. NW-T-2.3 (Vienna, IAEA, 2011) 100 p. https://www-pub.iaea.org/MTCD/Publications/PDF/Pub1517_Web.pdf
3. Data analysis and collection for costing of research reactor decommissioning. IAEA-TECDOC-1832 (Vienna, IAEA, 2017) 126 p. https://www-pub.iaea.org/MTCD/Publications/PDF/TE1832_web.pdf
4. General safety provisions for the decommissioning of nuclear installations. NP 306.2.230-2020. Registered with the Ministry of Justice of Ukraine on 30.12.2020 for No. 1311/35594. (Ukr) http://online.budstandart.com/ua/catalog/doc-page?id_doc=95439
5. Planning, managing and organizing the decommissioning of nuclear facilities: lessons learned. IAEA-TECDOC-1394 (Vienna, IAEA, 2004) 111 p. https://www-pub.iaea.org/MTCD/Publications/PDF/te_1394_web.pdf
6. Selection of Decommissioning Strategies: Issues and Factors. IAEA-TECDOC-1478 (Vienna, IAEA, 2005) 51 p. https://www-pub.iaea.org/MTCD/publications/PDF/TE_1478_web.pdf
7. Preparing for Decommissioning During Operation and After Final Shutdown. OECD/NEA No. 7374 (Paris, 2018) 164 p. https://www.oecd-nea.org/jcms/pl_15058/preparing-for-decommissioning-during-operation-and-after-final-shutdown?details=true
8. B.K. Bylkin et al. Development of decommissioning strategy for the MR reactor. Kerntechnik 75 (2010) 30. https://doi.org/10.3139/124.110057
9. G. Toth. Initial decommissioning planning for the Budapest research reactor. Nuclear Technology and Radiation Protection 26(1) (2011) 92. https://doi.org/10.2298/NTRP1101092K
10. F. Meyer. Decommissioning of the ASTRA research reactor – planning, executing and summarizing the project. Nuclear Technology and Radiation Protection 25(3) (2010) 229. https://doi.org/10.2298/NTRP1003229M
11. D. Craig et al. Technical features of the MR reactor decommissioning. Nuclear Technology and Radiation Protection 23(2) (2008) 79. https://doi.org/10.2298/NTRP0802079C
12. T.G. Apostolov, E.I. Anastasova, V.D. Anastasov. Implementation of the partial dismantling of research reactor IRT-Sofia prior to its refurbishment. Nuclear Technology and Radiation Protection 25(3) (2010) 249. https://doi.org/10.2298/NTRP1003249A
13. D. Craig et al. Dismantling design for the loop rooms on the MR reactor. Nuclear Engineering and Design 239(12) (2009) 2832. https://doi.org/10.1016/j.nucengdes.2009.08.011
14. Decommissioning of nuclear power plants, research reactors and other nuclear fuel cycle facilities. IAEA Safety Standards Series No. SSG-47 (Vienna, IAEA, 2018) 120 p. https://www-pub.iaea.org/MTCD/Publications/PDF/P1812_web.pdf
15. Yu.N. Lobach, M.V. Lysenko, V.N. Makarovsky. Substantiation of the decommissioning strategy selection for the research nuclear reactor WWR-M. Nuclear and Radiation Safety 12(4) (2009) 46. (Ukr) https://doi.org/10.32918/nrs.2009.12-3(43).09
16. Yu.N. Lobach et al. Progress in the decommissioning planning for the Kiev’s research reactor WWR-M. Nuclear Technology and Radiation Protection 25(3) (2010) 239. https://doi.org/10.2298/NTRP1003239L
17. Yu.N. Lobach, V.N. Shevel. Pre-decommissioning complex engineering and radiation inspection of the WWR-M reactor. Kerntechnik 79 (2014) 128. https://doi.org/10.3139/124.110339
18. Yu.N. Lobach, E.V. Svarichevskaya, V.V. Trishin. Peculiarities of the environmental impact assessment at the decommissioning of the research reactor WWR-M. Nuclear and Radiation Safety 11(3) (2008) 29. (Ukr) https://doi.org/10.32918/nrs.2008.11-3(39).07
19. Decommissioning of research reactors: Evolution, state of the art, open issues. IAEA Technical Report Series No. 446 (Vienna, IAEA, 2006) 169 p. https://www-pub.iaea.org/MTCD/Publications/PDF/TRS446_web.pdf
20. Decommissioning techniques for research reactors. IAEA-TECDOC-1273 (Vienna, IAEA, 2002) 268 p. https://www-pub.iaea.org/MTCD/Publications/PDF/te_1273_prn.pdf
21. Selection of technical solutions for the management of radioactive waste. IAEA-TECDOC-1817 (Vienna, IAEA, 2017) 114 p. https://www-pub.iaea.org/MTCD/Publications/PDF/TE-1817_web.pdf
22. Yu.N. Lobach, G. Toth. Design for the WWR-M reactor vessel removal. Nuclear Engineering and Design 258 (2013) 184. https://doi.org/10.1016/j.nucengdes.2013.01.032
23. Yu.N. Lobach, M.T. Cross. Dismantling design for a reference research reactor of the WWR type. Nuclear Engineering and Design 266 (2014) 155. https://doi.org/10.1016/j.nucengdes.2013.11.041
24. S. Tozser. Full-scale reconstruction and upgrade of the Budapest research reactor. In: IAEA-TECDOC-1625. (Vienna, IAEA, 2009) p. 83. https://inis.iaea.org/collection/NCLCollectionStore/_Public/40/091/40091226.pdf?r=1
25. R. Deju et al. Dismantling of the VVR-S nuclear research reactor vessels. Acta Physica Polonica A 134(1) (2018) 300. https://doi.org/10.12693/APhysPolA.134.300
26. Yu.N. Lobach, V.N. Shevel. Design for the dismantling of the WWR-M primary cooling circuit. International Nuclear Safety Journal 3(4) (2014) 25. https://nuclearsafety.info/international-nuclear-safety-journal/index.php/INSJ/article/view/44/pdf
27. Yu.N. Lobach, E.D. Luferenko, V.N. Shevel. Radiation protection performance for the dismantling of the WWR M primary cooling circuit. Radiation Protection Dosimetry 162(3) (2014) 416. https://doi.org/10.1093/rpd/nct306
28. Managing low radioactivity material from the decommissioning of nuclear facilities. IAEA Technical Reports Series No. 462 (Vienna, IAEA, 2008) 213 p. https://www-pub.iaea.org/MTCD/publications/PDF/trs462_web.pdf